Laiest Land Deelopment
LAIEST GROUP │ 中文版
  • About Us
  • News
  • Buildings
  • Careers
  • Contact
Laiest Land Deelopment
Buildings
  • Laiest Building I
  • Intro
  • Photo
  • Laiest Building II
  • Intro
  • Photo
  • Probe Industrial Park
  • Intro
  • Photo
Laiest Building I

 

Introduction of Laiest Building I

Location

No. 69, Sec. 3, Hui-Chung Road,

Nan-Tun District, Taichung City

Story 13F / B2F
Standard Space 

136 pings per office

450 m2 per office

Standard Floor Net Height  3.6 m per story
Year of Inauguration 

Year 2000

Lobby and First Floor Net Height  6.2 m
Structure

Reinforced concrete

Exterior Wall High compressive strength tile and marble
Construction Material 

Fireproof construction materials with fireextinguishing system 

Flat-deck Roof Reinforced concrete
Floor

Marble floor in every elevator lobbies

Internal Wall Reinforced concrete painted with Dulux low-allergy paint

Sanitary Equipment

Each office is equipped with independent pantry room and bathrooms for males and females     
Elevator

Two Toshiba high-speed elevators ( 105 m/min )

Each with capacity of 12-person

Disaster Protection System

1. Automatic sprinklers for offices

2. Automatic foam fire extinguishers are installed in the parking lot 

3. Automatic fire alarms

4. Automatic smoke exhaust device

5. Emergency Public Address Equipment

Air-conditioning System 

Carrier 20-ton Air-cooled Variable Frequency Air-conditioning System

Each floor is equipped with independent air-conditioning system

Central Monitoring System

1. 24-hour security guard to safeguard the building occupants.

2. The central monitoring system controls the air-conditioning system, power supply, water draining, lighting system and disaster protection system of the building 

3. Video cameras are installed in common areas to monitor the building entry and exit

4. Elevator door access card readers are installed to control the personnel entry and exit

Emergency Generator

German MAN 400-horsepower Generator

Emergency Lighting System The emergence lighting system with an illumination of at least 1 Lux is equipped pursuant to the firefighting regulations
Telecommunication Equipment Reserved line and outlet for Chunghwa Telecom Fiber-optic communication, information and community antenna Grounding Device

Each system is separately equipped with the grounding device

1. Grounding device for the telecommunication equipment

2. Grounding device for the light-current system

3. Grounding device for the lightning rod

4. Grounding device for the power equipment

Parking Lot

B1F: Ground-type parking lot

B2F: Lifted parking lot

Landscaping of Common Area Green Landscaping/Planting of Taiwan White Pine; creating a Zen style of Japanese garden design; equipped with automatic artificial fog system

 


檢視較大的地圖

LAIEST GROUP
392, Sec. 3, Zhong-Qing Road, Taichung, Taiwan, 40761 TEL: +886-4-2426-8898 FAX: +886-4-2426-6789 E-mail:estate@laiest.com.tw
Probe Industrial | Impressing Media | Laiest Land | Laiest Co. | Copyright © 2025 LAIEST GROUP All Rights Reserved. Powered By PKthink.