Laiest Land Deelopment
LAIEST GROUP │ 中文版
  • About Us
  • News
  • Buildings
  • Careers
  • Contact
Laiest Land Deelopment
Buildings
  • Laiest Building I
  • Intro
  • Photo
  • Laiest Building II
  • Intro
  • Photo
  • Probe Industrial Park
  • Intro
  • Photo
Laiest Building II

 


Introduction of Laiest Building II

Location

No. 338, Ta-Tun 11th Street,

Nan-Tun District, Taichung City

Story 10F / B2F
Standard Space 

60 - 72 pings ( 198 - 238 m2 ) per office

197 - 330 pings ( 651 - 1091 m2 ) per floor

Standard Floor Net Height  3.6 m per story
Year of Inauguration 

Year 2005

Lobby and First Floor Net Height  6.2 m
Structure

Reinforced Concrete

Exterior Wall High compressive strength tile
Construction Material 

Fireproof construction materials with fireextinguishing system 

Flat-deck Roof Reinforced concrete
Floor Marble floor around every elevator shaft and lobby Internal Wall

Reinforced concrete painted with Dulux low-allergy paint

Office: Light-weight partition painted with Dulux low-allergy paint

Elevator: Marble wall surface

Pantry Room & Bathroom: slate tile for wall surface

Sanitary Equipment

Each floow is equipped with independent pantry room and bathrooms for males and females     
Elevator

Two Fujitec high-speed elevators ( 205 m/min )

Each with capacity of 12-person

One Fujitec high-speed emergency elevators ( 205 m/min )

With capacity of 12-person

Disaster Protection System

1. Automatic sprinklers for offices

2. Automatic foam fire extinguishers are installed in the parking lot 

3. Automatic fire alarms

4. Automatic smoke exhaust device

5. Emergency Public Address Equipment

Air-conditioning System 

1. Each office is equipped with independent Hitachi power-saving variable frequency heating & air-conditioning System 

2. The bathrooms are equipped with the exhaust ventilation equipment

Central Monitoring System

1. 24-hour security guard to safeguard the building occupants

2. The central monitoring system controls the air-conditioning system, power supply, water draining, lighting system and disaster protection system of the building 

3. Video cameras are installed in common areas to monitor the building entry and exit

4. The elevators are placed under the control of the central monitoring system; moreover, elevator door access card readers are installed to control the personnel entry and exit 

Emergency Generator

German MAN 400Kw diesel engine generator is installed

The central monitoring system regulates the load and determines the supply priority

Emergency Lighting System The emergence lighting system with an illumination of at least 1 Lux is equipped pursuant to the firefighting regulations
Telecommunication Equipment 

Reserved line and outlet for Chunghwa Telecom fiber-optic communication

Reserved line and outlet for Taiwan Fixed Network fiber-optic communication 

Grounding Device

Each system is separately equipped with the grounding device

1. Grounding device for the telecommunication equipment

2. Grounding device for the light-current system

3. Grounding device for the lightning rod

4. Grounding device for the power equipment

Parking Lot

B1F : Ground-type parking lot

B2F : Ground-type parking lot

Landscaping of Common Area Green Landscaping/Planting of Taiwan White Pine and Japanese cherry blossom; creating a Zen style of Japanese garden design; equipped with automatic artificial fog system

 


檢視較大的地圖
LAIEST GROUP
392, Sec. 3, Zhong-Qing Road, Taichung, Taiwan, 40761 TEL: +886-4-2426-8898 FAX: +886-4-2426-6789 E-mail:estate@laiest.com.tw
Probe Industrial | Impressing Media | Laiest Land | Laiest Co. | Copyright © 2025 LAIEST GROUP All Rights Reserved. Powered By PKthink.