Introduction of Probe Industrial Park
Location |
No. 392, Sec. 3, Chung-Ching Road, Xi-Tun District, Taichung City |
Story | 13F / B1F |
Standard Space |
168 pings per office 555 m2 per office |
Standard Floor Net Height |
3.6 m per story with light weight ceiling 4.1 m per story without light weight ceiling |
Year of Inauguration |
Year 2011 |
Lobby and First Floor Net Height | 6.5 m |
Structure |
Reinforced concrete |
Exterior Wall | LED energy-saving insulating glass curtain wall and high compressive strength tile |
Construction Material |
Fireproof construction materials with fireextinguishing system |
Flat-deck Roof | Lightweight and energy-saving aluminum magnesium alloy panel |
Floor |
1F Lobby Floor: German calcined stone Office Floor: High compressive strength tile |
Internal Wall |
Reinforced concrete painted with Dulux low-allergy paint Elevator: Marble wall surface Pantry Room & Bathroom: Marble wall surface |
Sanitary Equipment |
Each office is equipped with independent pantry room and bathrooms for males and females | ||
Elevator |
Two Fujitec high-speed elevators ( 205 m/min ) Each with capacity of 15-person |
Disaster Protection System |
1. Automatic sprinklers for offices 2. Automatic foam fire extinguishers are installed in the parking lot 3. Automatic fire alarms 4. Automatic smoke exhaust device 5. Emergency Public Address Equipment |
Air-conditioning System |
1. Each floor is equipped with independent Hitachi power-saving air-conditioning System 2. Each floor is equipped with fresh air exchange system 3. The bathrooms are equipped with the exhaust ventilation equipment |
Central Monitoring System |
1. 24-hour security guard to safeguard the building occupants. 2. The central monitoring system controls the air-conditioning system, power supply, water draining, lighting system and disaster protection system of the building 3. Video cameras are installed in common areas to monitor the building entry and exit 4. Elevator door access card readers are installed to control the personnel entry and exit |
Emergency Generator |
CATERPILLAR 400Kw diesel engine generator is installed The central monitoring system regulates the load and determines the supply priority |
Emergency Lighting System | The emergence lighting system with an illumination of at least 1 Lux is equipped pursuant to the firefighting regulations |
Telecommunication Equipment | Reserved line and outlet for Chunghwa Telecom Fiber-optic communication | Grounding Device |
Each system is separately equipped with the grounding device 1. Grounding device for the telecommunication equipment 2. Grounding device for the light-current system 3. Grounding device for the lightning rod 4. Grounding device for the power equipment |
Parking Lot |
Outdoor parking B1F : Ground-type parking lot |
Landscaping of Common Area |
Turf grass and Landscaping for an area of 2,000 pings ( 6,612 m2 ); planting of more than 400 trees Including Japanese Cherry Blossom, Bald Cypress, Red Pine, Taiwanese White Pine, Taiwanese Incense Cedar, Fragrant Osmanthus, and Mahogany. 70-meter long ecological pond; landscape pond with an area of 120 m2 |